BR100 Increased By (0.63%)
BR30 Increased By (0.89%)
KSE100 Increased By (0.39%)
KSE30 Increased By (0.41%)
BAFL 58.60 Increased By ▲ 0.16 (0.27%)
BIPL 25.38 Increased By ▲ 0.18 (0.71%)
BOP 34.30 Increased By ▲ 0.31 (0.91%)
CNERGY 8.15 Increased By ▲ 0.04 (0.49%)
DFML 20.95 Increased By ▲ 0.11 (0.53%)
DGKC 195.21 Increased By ▲ 2.24 (1.16%)
FABL 89.76 Decreased By ▼ -0.03 (-0.03%)
FCCL 53.26 Increased By ▲ 0.43 (0.81%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
GGL 19.61 Increased By ▲ 0.64 (3.37%)
HBL 286.61 Increased By ▲ 1.11 (0.39%)
HUBC 215.20 Increased By ▲ 0.82 (0.38%)
HUMNL 10.88 No Change ▼ 0.00 (0%)
KEL 8.15 Increased By ▲ 0.13 (1.62%)
LOTCHEM 27.63 Decreased By ▼ -0.26 (-0.93%)
MLCF 87.00 Increased By ▲ 0.49 (0.57%)
OGDC 322.80 Increased By ▲ 2.84 (0.89%)
PAEL 39.76 Increased By ▲ 0.34 (0.86%)
PIBTL 16.98 Increased By ▲ 0.31 (1.86%)
PIOC 269.47 Increased By ▲ 3.41 (1.28%)
PPL 229.39 Increased By ▲ 1.21 (0.53%)
PRL 34.71 Increased By ▲ 0.03 (0.09%)
SNGP 99.20 Increased By ▲ 0.02 (0.02%)
SSGC 26.83 Increased By ▲ 0.23 (0.86%)
TELE 8.58 Increased By ▲ 0.30 (3.62%)
TPLP 8.65 Increased By ▲ 0.43 (5.23%)
TRG 69.61 Decreased By ▼ -0.10 (-0.14%)
UNITY 11.69 Increased By ▲ 0.02 (0.17%)
WTL 1.29 Increased By ▲ 0.01 (0.78%)

مشتاق گھمن

نیلم جہلم ہائیڈرو پاور پراجیکٹ : ڈیزائن میں سنگین خامیوں کی نشاندہی
پاکستان

نیلم جہلم ہائیڈرو پاور پراجیکٹ : ڈیزائن میں سنگین خامیوں کی نشاندہی

  • منصوبہ 500 ارب روپے سے زائد کی لاگت سے تعمیر کیا گیا جس میں نقائص کی وجہ سے کئی سال تاخیر ہوئی ، اس وجہ سے اسے وقتا فوقتا مکمل یا جزوی طور پر بند کردیا گیا تھا ۔ رواں سال مئی کے پہلے ہفتے سے یہ بند ہے۔
اپ ڈیٹ 01 جولائ 2024 12:48pm